Home » Pressroom » News Archive » 2017 » A new controlled directional oil-well of more than 4910 m depth was built on Titov’s oilfield in Nenets Autonomous Okrug by GAZPROM-Burenie company
A new controlled directional oil-well of more than 4910 m depth was built on Titov’s oilfield in Nenets Autonomous Okrug by GAZPROM-Burenie company
17 апреля 2017 года 17.04.2017A new controlled directional oil-well of more than 4910 m depth was built on Titov’s oilfield in Nenets Autonomous Okrug by GAZPROM-Burenie company. A drilling rig "BU-5000/320 EKBM" equipped with a top drive system DQ50BQ was used for this purpose.
The top drive system had the following maximum operating parameters:
- rotation speed - up to 120 rpm/min;
- torque - up to 24 kNm.
Our customers satisfied with the reliability, security and performance of equipment, the quality and the timing of our work.
Our top drives are effective in the drilling of obliquely-directional and horizontal wells with long borehole.