Home » Pressroom » News Archive » 2016 » Oil well for ROSNEFT company was finished
Oil well for ROSNEFT company was finished
17 февраля 2016 года 17.02.2016The new oil well was finished on Labaganskoe oilfield for ROSNEFT company with the using of the top drive system DQ50BQ, which was set on the drilling rig 'ВЗБТ №3900-225'. The well depth was more than 2000 m.
Performance of the top drive had the following maximum values:
- rotation speed 60 rpm/min;
- torque 27 kNm.
Our customers satisfied with the reliability, security and performance of equipment, the quality and the timing of our work.
Our top drives are effective in the drilling of obliquely-directional and horizontal wells with long borehole.