Home » Pressroom » News Archive » 2016 » Oil well for ROSNEFT company was completed
Oil well for ROSNEFT company was completed
17 февраля 2016 года 17.02.2016The new oil well was completed on Priobskoe oilfield for ROSNEFT company with the using of the top drive system DQ50B, which was set on the drilling rig ' Уралмаш 5000/320 ЭК-БМЧ'. The well depth was more than 3100 m.
Performance of the top drive had the following maximum values:
- rotation speed 70 rpm/min;
- torque 22 kNm.
Our customers satisfied with the reliability, security and performance of equipment, the quality and the timing of our work.
Our top drives are effective in the drilling of obliquely-directional and horizontal wells with long borehole.