Home » Pressroom » News Archive » 2016 » Drilling on Priobskoe oilfield for ROSNEFT company
Drilling on Priobskoe oilfield for ROSNEFT company
16 июня 2016 года 16.06.2016The new directional oil well was finished on Priobskoe oilfield for ROSNEFT company with the using of the top drive system DQ50B, which was set on the drilling rig 'БУ-5000-320БМ'. The well depth was more than 3200 m.
Performance of the top drive had the following maximum values:
- rotation speed 60 rpm/min;
- torque 27 kNm.
Our customers satisfied with the reliability, security and performance of equipment, the quality and the timing of our work.
Our top drives are effective in the drilling of obliquely-directional and horizontal wells with long borehole.