Home » Pressroom » News Archive » 2016 » Building for ROSNEFT company
Building for ROSNEFT company
10 мая 2016 года 10.05.2016The new directional oil well was completed on Priobskoe oilfield for ROSNEFT company with the using of the top drive system DQ50B, which was set on the drilling rig ' БУ-5000 - 320БМ'. The well depth was more than 2800 m.
Performance of the top drive had the following maximum values:
- rotation speed 60 rpm/min;
- torque 20 kNm.
Our customers satisfied with the reliability, security and performance of equipment, the quality and the timing of our work.
Our top drives are effective in the drilling of obliquely-directional and horizontal wells with long borehole.