Home » Pressroom » News Archive » 2014 » Drilling well for KNG oil company
Drilling well for KNG oil company
08 апреля 2014 года 08.04.2014Drilling of the new well was completed at Krasnoleninskoe oilfield for KNG oil company. The well depth was more 2900 m.
Our top drive DQ50BQ has demonstrated its reliability, performance, safety during operation vith the temperature -45oC.
Performance of the top drive had the following maximum values:
- rotation speed 95 rpm./min.;
- torque 18 kNm.
The customer was satisfied with the reliability, security and performance of equipment, the quality and the timing of our work.
Our top drives are effective in the drilling of obliquely-directional and horizontal wells with long borehole.