Home » Pressroom » News Archive » 2014 » Drilling for TATNEFT
Drilling for TATNEFT
24 марта 2014 года 24.03.2014Construction of the new well was completed at Shegurchinskoe oilfield for TATNEFT oil company. The well depth was more 1100 m.
Our top drive DQ20B was mounted on the rig Kremco K100. Our equipment has demonstrated its reliability, performance, safety during operation.
Performance of the top drive had the following maximum values:
- rotation speed 10 rpm. / min.;
- torque 5 kNm.
The customer was satisfied with the reliability, security and performance of equipment, the quality and the timing of our work.
Our top drives are effective in the drilling of obliquely-directional and horizontal wells with long borehole.