Home » Pressroom » News Archive » 2014 » Ddrilling for NOVATEK
Ddrilling for NOVATEK
07 марта 2014 года 07.03.2014Directional well was drilled on the East Tarkosalinskoye field in the Polar Siberia for NOVATEK oil & has company. The well depth was more 4100 m. Our top drive system DQ50B was used at -40oC.
Performance of the top drive had the following maximum values:
- rotation speed 100 rpm. / min.;
- torque 30 kNm.
The customer was satisfied with the reliability, security and performance of equipment, the quality and the timing of our work.
Our top drives are effective in the drilling of obliquely-directional and horizontal wells with long borehole.