Home » Pressroom » News Archive » 2014 » Building well for TATNEFT oil company
Building well for TATNEFT oil company
02 июня 2014 года 02.06.2014The new well was drilled in Spiridonovskoe oilfield for TATNEFT oil company with the using of the top drive system DQ20B.
Performance of the top drive had the following maximum values:
- rotation speed 25 rpm./min.;
- torque 10 kNm.
TATNEFT was satisfied with the reliability, security and performance of equipment, the quality and the timing of our work.
Our customers satisfied with the reliability, security and performance of equipment, the quality and the timing of our work.
Our top drives are effective in the drilling of obliquely-directional and horizontal wells with long borehole.