A new production oil well of more than 3520 meters depth was built in Kharbeiskoe gaz&oil field in Yamal-Netetsk Autonomous region
07 октября 2020 года 07.10.2020A new controlled directional production oil-well of more than 3520 meters depth was built by SSK drilling company in Kharbeiskoe gas&oil field in Yamal-Nenetsk Autonomous region for Navatek gaz company. A drilling rig Uralmash 5000/320 EK BMCH equipped with a top drive DQ70BSQ-JH was used for this purpose. A top drive aftermarket field service support was provided by SLC service engineers working 24 hours 7 days a week with a drilling crew under service agreement with SSK drilling company.
DQ70BSQ-JH is one of the high performance models of top drives and provides drilling of the wells up to 7000 meters deep (with a 114 mm drill pipe). The top drive is equipped with two asynchronous frequency controlled electric motors with a power of 500 hp each. This allows to perform drilling with a smooth shaft speed changes in the range from 0 to 220 rpm and with a working torque of up to 65 kNm.