SLC-Group. The top drive system.
+7 (495) 133-87-57
Home » Pressroom » News Archive » 2017 » A new controlled directional oil well of more than 3850 meters depth was built in Karayskoe oil field in Tomsk region

A new controlled directional oil well of more than 3850 meters depth was built in Karayskoe oil field in Tomsk region

13.08.2017

A new controlled directionall oil-well of more than 3850 meters depth was built in Karayskoe oil field in Tomsk region for ROSNEFT company.

A drilling rig Uralmash 300 EUK equipped  with a top drive DQ50B-JH  was used for this purpose. A non-stop top drive performance was provided by SLC service engineers working 24 hours a day 7 days a week with a drilling crew under service agreement with RN-Burenie  company.

The DQ50B-JH as well as DQ50BQ-JH is the most popular top drive model among drilling companies.  It allows to build fishbone oil-wells of up to 5000 meters depth (using drilling 144mm tubes) as quickly as possible. The top drive is equipped with an asynchronous frequency controlled electric motor of  500hp power. This allows to drill with a smooth shaft speed changes in the range from 0 to 180 rpm and with a working torque of up to 40 kNm.